Categories | Climatic Test Chamber |
---|---|
Brand Name: | OTS |
Model Number: | XB-OTS-408 |
Certification: | CE |
Place of Origin: | China |
MOQ: | one set |
Price: | Negotiable |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 50 Unit/Units per Month |
Delivery Time: | 30 working day after getting the payment |
Packaging Details: | Strong standard wood case, inner plastic films wrapped for IEC Battery Tester Fast Change Temperature Thermal Shock Environmental Chamber |
model: | XB-OTS-408 |
Product name: | IEC Battery Tester Fast Change Temperature Thermal Shock Environmental Chamber |
Usage: | Thermal Shock Test Chamber |
Controller: | Programmable LCD touch screen |
Compressor: | Original Germany Brand |
Shock temperature :: | -50°C~150°C |
System: | P.I.D+S.S.R+Micro-coemmputer balanced temperature control |
Test method: | air to air |
IEC Battery Tester Fast Change Temperature Thermal Shock Environmental Chamber
Applicable Industries
IEC Battery Tester Fast Change Temperature Thermal Shock Environmental Chamber that subjects a product to alternating extremes of high and low temperatures in order to observe changes in product characteristics and failure occurrence caused by different materials and their thermal expansion coefficients. Thermal shock chamber utilizes controlled areas for hot, ambient and cold temperatures. The product is moved from ambient to hot or ambient to cold zones. The chamber can be programmed to include a dwell period in the ambient zone if desired.It is applicable to metals, plastic, rubber, electronics amongst other materials. The test result can be Used as a reference or basis for product improvement.
Specification
Model | XB-OTS-50 | XB-OTS-80 | XB-OTS-150 | XB-OTS-225 | XB-OTS-408 |
---|---|---|---|---|---|
Internal size WxHxD(cm) | 36×40×35 | 40×50×40 | 50×60×50 | 60×75×50 | 80×85×60 |
External size WxHxD(cm) | 148x175x160 | 150X175X165 | 155x185X165 | 165x200X175 | 185x210x185 |
Shock Temperature ragne | -65°C~150°C | ||||
Heating up time | RT~200°C about 35min | ||||
Cooling down time | RT~-70°C about 90min | ||||
Temp recover time/change time | ≤ 5min | ||||
Temp control accuracy | ±0.5°C / ±2.0°C | ||||
distribution accuracy |
Shock Temperature ragne | -65°C~150°C |
Heating up time | RT~200°C about 35min |
Cooling down time | RT~-70°C about 90min |
Temp recover time/ change time | ≤5min / ≤10sec |
Temp control accuracy/ | ±0.5°C / ±2.0°C |
distribution accuracy | |
Inner materials | SUS 304# stainless steel plate for inner chamber,and stainless steel plate |
+ spray painting for external chamber. | |
Insulation materials | High-temperature high-density amino acid ethyl ester foam insulator material. |
Systems | P.I.D+S.S.R+Microcomputer balanced temperature control system. |
Cooling systems | Semi-hermetic two-stage compressor (water-cooled) / |
hermetic two-stage compressor (air-cooled). | |
Safety devices | Fuse switch, high and low pressure protection switch compressors, |
refrigerant pressure protection switch failure warning system, electronic siren. | |
Fitting | Outlook window (special purchase), the upper and lower adjustable |
compartment two energized measured line hole, casters,level bracket. | |
Power | 3 phase AC380V 50HZ/60HZ |
Controller | Tanwan TATO or TH900C |
Compressor | Germany / Bock Brand |
Features
1.Thermal shork chamber in each zone for peak demand of heating and
cooling. Provides extra thermal energy to efficiently meet the
MIL-STD 883 requirements.
2.Temperature recorder provides 24 hour part temperature recording
as the load travels from zone to zone. Using touch-control graph
control as operation interface, easy to operate.
3.The system can be used for automatic Circulation Shock or manual
selective shock, capable of setting two zones or three zones shocks
as well as cold and thermal shock start-up.
4.Custom-made and optional accessories available.
Corresponding Standard
GB11158 GB10589-89 GB10592-89
GB/T10586-89 GB/T2423.22-2001 GB/T2423.1-2001
GB/T2423.2-2001 GB/T2423.3-93 GB/T2423.4-93
ASTM D1735 EIA - 364-59 IEC60068-2-1.1990
IEC60068-2-2.1974 IEC 68-2-30 IEC68-2-03 EIA - 364-31C
Safety Devices of Three-Zone High and Low Temperature Shock Simulate Chamber:
Thermal Shock Chambers maintenance actions
1) a reasonable choice of installation location to install
measures: dry, non-drip of rain and snow place.
2) inspection measures qualified by hand daily for insulation
materials is broken steam pipe is blocked for technical
confirmation and disposal technology.
3) the alarm can be installed as conditional steam leak or
power-off state of alarm sound and light small device to facilitate
the holding of risk freezing measures discovery and timely
remediation.
4) instrument maintenance inspection measures by the area
responsible for regular inspection by a predetermined inspection
route. To check the insulation inspection of pipeline valve is
normal, the incubator is normal, hydrophobic means is normal,
thermal insulation material packaging is intact, electric heating
power supply and other components is normal.
Please feel FREE to contact us if you have any needs.